The advertised starting price isn't a valuation of the apartment you're considering. Compare the exact home, its usable space and the cash you'll need at handover, including costs outside the headline.

What is Bond Enclave, and what does Pearlshire publish?

The official Bond Enclave page describes 158 residences in a building with a basement, ground floor, eight floors and a roof. It names Tony Ashai as architect and Globecon Construction as contractor. These are developer statements checked on 17 November 2026.

Published itemWhat to check for your purchase
Arjan locationExact plot, building entrance and apartment reference
One, two and three bedroomsThe signed plan for your unit, including area definitions
Starting price AED 1,149,777Current AED quote, validity date and all exclusions
30% during construction, 70% at handoverInstalment dates, payment triggers and what counts as handover
Completion target 30 November 2027Delivery clause, extension rights and notice procedure in your agreement

Keep this table beside the offer. If the offer differs, ask for a written explanation and the document that governs your purchase. A newer marketing page doesn't amend a signed agreement by itself.

Bond Living is a separate Pearlshire project. Don't carry its location, completion date or apartment specification into this purchase. Write the full project name on requests for documents so the answer can be matched to the home.

How do you check the location in Arjan?

Ask for a pin at the intended residential entrance. A map centred on Arjan is too broad to test your daily journey. Save the route from the entrance to work, school or the place you visit most, then try it at the time you'll actually travel.

Visit the immediate streets as well as a show apartment. Look at the approach to parking, pedestrian crossings, neighbouring plots and places where deliveries would stop. Ask which roads and pavements are open today and which are still planned.

For an off-plan purchase, ask what the developer expects to provide by handover. Put that answer beside the delivery specification. A convenient route shown in a presentation may depend on work outside the building's boundary.

If you're comparing another apartment around this part of Dubai, the Bali Residences checking guide offers a useful second set of unit and document questions. Compare the same fields; nearby addresses alone don't make two homes equivalent.

Which floor plan and area should you compare?

Get the drawing for the actual apartment number. Mark furniture on it: a dining table, a desk behind a closed door, the bed you own. Check the path from the entrance to each room and whether doors leave enough usable wall space.

Ask for internal area and balcony or terrace area separately, with the measurement unit written beside each number. If the quotation uses square feet and another uses square metres, convert both before comparing the price per unit of area. Use the built-up area guide to keep the definitions consistent.

The developer's project page uses fitted-suite wording. Request an itemised specification for appliances, wardrobes, kitchen joinery and bathroom fittings. Photographs of a furnished interior don't tell you which loose furniture, lighting or decorative pieces are included in your agreement.

Check orientation and adjoining uses too. Ask what sits above, below and beside your home, including service spaces. For a terrace, ask who maintains drainage, planting and waterproofing, and which changes require permission. Put the answers against the plan, rather than keeping them in a separate sales message.

How does the advertised 30/70 payment plan affect you?

The developer advertises 30% during construction and 70% at handover. The signed payment annex should show the actual dates and triggers. Ask whether each due date runs from booking, contract signature or a fixed calendar date, and what happens if registration takes longer than expected.

Hypothetical example: at an assumed purchase price of AED 2,000,000, 30% is AED 600,000 and 70% is AED 1,400,000. The calculation is AED 2,000,000 × 0.30 and × 0.70. It illustrates the split only; it isn't a Bond Enclave quote and excludes registration, financing and other costs.

Build a cash calendar from the annex. Put every instalment on its own line, with the due date, amount in AED and source clause. Add separate rows for quoted charges instead of assuming they fit inside the purchase price.

If you need a mortgage for the final balance, discuss the particular home and delivery timetable with the lender before relying on finance. Ask what documents and valuation it will require, when approval expires and what happens if it lends less than you expected. An early conversation doesn't guarantee funding at handover.

Read the sale and purchase agreement checklist beside the proposed annex. Check when you must produce the final balance before deciding whether the first payment suits your budget.

What should you verify before sending money?

Use the DLD Project Status Enquiry with the project name, project number or land number. DLD's instructions describe those search fields and list support on 8004488. A missing name search is a reason to check spelling and references, rather than infer a registration status.

Request the legal developer and seller names, the registered project reference and the account details through an authenticated channel. Compare them with the contract and the project information in Dubai REST, which DLD describes as providing off-plan and escrow information.

Before paying, resolve any mismatch. If the account beneficiary, project name or company differs between documents, ask the developer and DLD to explain it. Don't let a deadline in a sales message substitute for that answer.

The off-plan due diligence checklist helps organise the documents. Keep the offer, payment instructions, signed agreement, receipt and dated official result together. Keep your personal documents privately; this site doesn't need them.

Is the November 2027 date a confirmed handover?

Pearlshire publishes 30 November 2027 as the completion target. Its page also carries monthly construction-update labels, including October 2026. Those are developer communications. We haven't authenticated a matched DLD inspection date or completion percentage for this article.

Ask for the latest official project result and the developer's written delivery notice when available. Read the agreement for the delivery obligation, extensions and notice requirements. Keep completion of construction, readiness of shared facilities and your apartment's handover appointment as separate questions.

The guide to the causes of handover delays explains how to keep a timeline if dates change. Record the promised date, the notice you received and what it asks you to do. If you need legal advice, give the adviser the agreement and correspondence rather than a screenshot of the target date alone.

Which amenities and running costs need written answers?

Pearlshire advertises shared amenities including a pool, gym and outdoor cinema. Ask which will be available when you receive the apartment, how access works and whether any services carry separate charges. A facility on a project page doesn't explain its operating hours or maintenance budget.

Request the proposed annual budget, the area used for billing and the basis for any service-charge estimate. Ask about cooling, parking, utilities and building insurance separately. No verified apartment-specific service-charge amount is published here.

For your own comparison, write two totals: cash needed to complete the purchase and annual spending after moving in. Keep unknown amounts blank with a question beside them. Ask who will supply each missing amount and when you can expect the written answer. Filling gaps with estimates from another building makes a cheaper-looking offer difficult to assess honestly.

FAQ

Who is developing Bond Enclave?

Pearlshire presents it as its Arjan project. Match the full legal developer and seller names to the DLD project reference and proposed agreement. A brand on a brochure doesn't identify every company involved in delivering or selling your apartment.

Is the advertised price available for any apartment?

No unit-specific availability has been verified here. The starting price was published by the developer when checked on 17 November 2026. Ask for the apartment number, price in AED, quote expiry and exclusions before comparing it with another offer.

Can you rely on a construction video for progress?

Treat it as a developer update, with its publication date. Obtain the matching DLD result separately and keep its inspection date. A video and an official inspection answer different questions; neither replaces the delivery terms for your particular apartment.

What should you request next?

Request one pack containing the unit plan, dated quote, legal seller details, registered project number, payment annex and draft agreement. Mark unresolved fields before reserving. Review the pack with your lender or adviser.