Match the home in your agreement to the brochure before choosing a layout. A picture can't confirm which apartment you will receive, what it includes or when you can move in.

Where is AUM Residence, and which project are you checking?

The developer's AG AUM Residence brochure places the project in Dubai Land Residence Complex. It names AG Properties and AGP Assets Real Estate Developments. Ask which legal entity signs your agreement and how that name matches the registered project.

Keep the full name on every document. AG's website separately lists AUM 99 Residence, so a shortened “AUM” heading isn't enough to identify the home. Ask for the registered project number and plot reference before comparing documents from different people.

Start with this small document pack:

DocumentMatch before proceeding
Dated apartment offerProject, building, floor and apartment number
Numbered floor planSame apartment reference, orientation and area units
Draft sale agreementSeller's legal name and all referenced annexes
Registered project detailsProject number and land reference matching the offer

Save the original files together. If a revised offer changes the apartment number, check the plan again rather than carrying your earlier choice forward. A different stack can change the outlook, balcony and route from the lift.

What do the floor plans actually tell you?

The official project page separates studios, one-bedroom and two-bedroom apartments. The brochure describes a 3B + G + 13 + R building configuration. These are developer descriptions, not confirmation that a particular floor or home is available today.

Ask for a dimensioned drawing for your apartment. Put a bed, dining table and sofa on it using their actual sizes. Check whether doors can open with furniture in place. For a studio, look at where you would work while someone else uses the kitchen.

Keep indoor space separate from the balcony and any other included area. A larger total can conceal a smaller living room. The built-up area guide explains why two apparently similar area figures may measure different things.

Questions to ask: is the drawing mirrored, which way do the windows face, and where are the air-conditioning equipment and service shafts? Request the parking allocation separately. A parking illustration doesn't identify your space or show whether a large vehicle will fit comfortably.

Don't assume the furniture shown comes with the apartment. Ask for an itemised specification covering fitted appliances, cabinetry and finishes. If a showroom feature matters to you, have the seller point to its place in the agreement's specification.

Which amenities and smart-home features are advertised?

The brochure advertises a gym, meditation space, children's play area, outdoor cinema, pools and smart-home features. Treat these as the developer's proposed facilities. Ask which will serve your building, when they are expected to open and whether use carries a separate charge.

For the smart-home system, request a device list and operating instructions. Find out which functions work without an internet connection and whether an ongoing subscription is needed. Ask who handles repairs after the warranty expires and whether you can change the administrator when ownership changes.

Write down the feature you need and the document that promises it. “Smart home” on a brochure cover gives you less to work with than a specification naming the installed controls.

Watch out: the brochure's final notice says its drawings, dimensions and facilities are approximate and its illustrations aren't contractual. Ask for the signed specification and annexes before treating any pictured feature as included. Have your adviser explain differences between those documents and the sales presentation.

How do you check construction and the handover date?

Open DLD's Project Status Enquiry. The service accepts a project name, project number or land number. Use the identifiers supplied for your agreement and check that the result describes the same development.

Keep the result's date beside any completion percentage. A developer's construction photograph or update remains developer-reported progress; it isn't a DLD inspection. No matched inspection result for this project is authenticated here.

Then read the delivery clause. Ask what triggers handover, what notices you should receive and how changes to the expected date are communicated. A date in a presentation and a date in a signed agreement may serve different purposes. Get any difference explained before signing.

If the dates already differ, use the handover-delay guide to prepare your questions. Keep the original contractual date, later written updates and your payment record in order. Avoid replacing the first date in your notes each time a new estimate arrives.

What are the price and payment plan in 2026?

There is no verified current apartment price or unit payment schedule in this guide. Request a dated offer in AED for the exact apartment. Ask how long it remains valid and whether the quoted amount includes every item described during the viewing.

Use three columns when comparing offers: the purchase amount, the cash due on each date, and the costs after possession. A low initial payment doesn't tell you the size of a later balance.

Ask forRecord in your comparison
Reservation termsAmount in AED, recipient and written refund conditions
Instalment scheduleEvery due date, amount and any construction trigger
Transaction-cost estimateEach charge, its recipient and whether it is confirmed or estimated
Possession costsFinal balance, utility setup and any other stated payment
Ongoing costsAnnual shared charges and separately billed services

Hypothetical budgeting example: if your own written schedule requires AED 90,000 in three months, setting aside AED 30,000 each month reaches that amount. This is arithmetic, not an AUM offer. Add other payments falling in those months before deciding whether the timetable works.

Read the sale agreement checklist with the draft open. Check late-payment provisions and cancellation terms as carefully as the headline price. Ask for a written explanation of any term you cannot reconcile with the offer.

How do you check payment instructions and annual costs?

DLD's Dubai REST overview describes access to off-plan project and escrow information. Confirm the relevant project and recipient independently before transferring funds. No bank account or payment instruction is verified by this article.

If someone changes the payment details, stop and verify the change through a contact route you obtained independently. Keep the written instructions and receipt with the apartment reference. The escrow requirements guide explains the documents to bring to that check.

For recurring charges, ask for the latest available budget and the basis of the estimate. Record the period and units: AED per year is different from AED per square foot per year. Ask which area is used and which services are billed outside the shared charge.

DLD's Service Charge Index distinguishes project, use and budget year, and says charges exclude arrears. A rate for another building or an earlier year isn't your bill. Use the service-charge checklist to separate approved charges, estimates and any seller balance requiring clarification.

What should you check on a location visit?

Ask for the actual entrance pin. Travel there at the time you would normally leave for work, then try the return journey. Keep your measured times and dates; a sales-map driving time doesn't describe your daily journey.

Walk the route you would use from parking to the lift. Check deliveries, visitor access and where a taxi can stop. If you are buying before completion, ask which arrangements are temporary and request the intended access plan.

For a family, contact the school you would use about places, fees and transport before connecting the purchase to a school move. A nearby school symbol doesn't reserve a seat. If you expect to let the apartment, keep any rental assumption separate from confirmed ownership costs; no rental return is promised here.

For a wider shortlist, the Dubai apartments comparison checklist separates the unit plan, building bills and purchase documents. Keep each building's quoted costs and payment dates together.

If you're comparing furnished apartments, the Cube Quarter name and furniture checks show what to request when an offer uses a different name from the developer page. Keep each apartment's inventory and payment calendar together.

FAQ

Is AUM Residence the same as AUM 99 Residence?

AG lists them separately on its website. Ask for the full registered project name, project number and plot reference. Use those identifiers on the offer, floor plan and agreement instead of relying on a shortened name.

Is there a confirmed handover date here?

No. Obtain the apartment's delivery clause and the latest dated project update. Check the corresponding DLD record separately. A project estimate doesn't confirm the day you will receive keys to your home.

Does the brochure confirm the apartment's size and fittings?

No. Its final notice qualifies the plans and illustrations. Request the exact apartment drawing and signed specification, with area units and included fittings. Resolve differences before paying a reservation amount.

What should you request first?

Ask for the numbered plan, draft agreement and full payment schedule in one pack. Then match the registered project and payment recipient. Keep unanswered questions beside the relevant document so you can resolve them before signing.